Primary Bathroom Remodel — Dallas, TX

A full bathroom transformation that turned an outdated, underused space into a modern, spa-like primary bathroom inspired by the homeowner’s selections and vision.

Our Approach

Project Overview

This project transformed the space into a fully remodeled primary bathroom. The goal was to create a calm, modern, and spa-like space that reflected the homeowner’s personal selections while improving comfort, function, and everyday use.

 

Rather than simply updating finishes, this remodel gave the space an entirely new purpose — bringing together layout planning, material coordination, waterproofing, tile work, fixtures, and finish details into one cohesive bathroom.

Project Details

Project Type:

Primary Bathroom Remodel

Location:

Lewisville, TX

Project Start:

03-17-2026

Project Completion

In 1 week

Project Investment:

[$45K–$65K]

Scope:

Full bathroom remodel, layout conversion, shower system, tile, vanity, plumbing fixtures, lighting, and finish work

Note under investment:

Final investment depends on scope, materials, selections, and approved additions.

Before & After

What started with massive columns was transformed into a spa-like primary bathroom designed around the homeowner’s own selections and vision. Use the slider to see how the space changed from outdated and underused to modern, calming, and personal.

017bc7eb-6acb-4712-9e0f-9dbb7aa53c27.jpg
Before
03-1213 Dame Susan Ln Final-3 (1).jpg
After

“I feel like the vision came to life. Every time we use the bathroom, it feels like a spa..”

The Goal

The homeowner wanted more than a standard bathroom update. The goal was to create a space that felt intentional, peaceful, and elevated — while making sure the design choices worked together in the final build.

Because the space was being reimagined from its previous use, planning and coordination were important from the beginning. Every decision needed to support both the finished look and the function of the bathroom.

Create a Spa-Like Feel

A calm, modern bathroom with a more elevated and relaxing atmosphere.

Give the Space New Purpose

Transform an underused area into a functional primary bathroom.

Support the Homeowner’s Vision

Bring together selections, materials, and finish details in a cohesive way.

Project Highlights

  • Custom made vanities with custom stain color

  • Quartz countertops

  • Free standing bathtub

  • WEDI Shower waterproofing

  • Two shower valves

  • Extended shower space

017bc7eb-6acb-4712-9e0f-9dbb7aa53c27.jpg

Timeline, Challenges & Solutions

Every remodel has details that need to be worked through. On this project, the focus was keeping the transformation organized while coordinating the new bathroom layout, selections, waterproofing, and finish details.

Timeline

Project Start: [Insert Date]

Project Completion: 5 week

Total Project Length: [example: 6–8 weeks]

Bathroom remodel timelines vary depending on scope, materials, inspections, and site conditions. For this project, the schedule was managed around the scope of work, material readiness, and the sequence needed to complete the bathroom properly.

Challenge
Reimagining the Space

This was not just a surface-level bathroom update. The space had to be converted from its previous use into a functional bathroom, which required thoughtful planning and coordination.

Solution

We approached the project by aligning layout, plumbing needs, waterproofing, tile work, and finish selections so the space could function well while still reflecting the homeowner’s design direction.

Coordinating Selections and Finish Details

The homeowner had a clear vision for the finished look, and the selections needed to work together in the actual space.

​

Solution

We helped bring the selections together through construction coordination, installation planning, and finish execution so the final bathroom felt cohesive and complete.

Project Photos

03-1213 Dame Susan Ln Final-3 (1)

Full after photo

B4B49F5F-E44A-47A4-B5DE-51115768A209 (1)

Shower view

7D71602B-CE68-48C8-9355-172D1C7FAA02

Vanity

02-1213 Dame Susan Ln Final-2

Tile / finish detail

07-11566 Castlebrook Ln Final-7

Lighting

Before 1

Storage

017bc7eb-6acb-4712-9e0f-9dbb7aa53c27

Before

17-1741 Lady Bettye Dr Final17

after

Client Experience

Project Note:

The finished bathroom was designed around the homeowner’s selections and vision, creating a personal space that feels calm, modern, and comfortable.